The power management system for the OSD-led Green Tug project has been developed. It will manage the output from two fuel cells, a bank of batteries and four diesel gensets.
To help refine the design into a full scale operational system, in-service power demand measurements will be done onboard the Iskes' tug Triton during all types of berthing and locking manoeuvres.

IJmuiden, The Netherlands
T: +31 255 54 50 70
Montrose Head Office, Scotland
York Office, UK
Appledore Office, UK
T: +44 1674 678 999
Singapore
T: +65 6265 1154
Shanghai, China
T: +86 21 5851 3412
E-mail us or check
our addresses